For larger fleets
A second, much larger grant: the Depot Charging Scheme
Most NI pages stop at the Workplace Charging Scheme. If you run a bigger operation, HGVs, vans or coaches
charging at a depot, the Department for Infrastructure also lists a Depot Charging Scheme, and it is on a
different scale.
70%
Of chargepoint and civil (groundworks) costs.
£1m
Maximum across all your sites, with no limit on the number of sites.
1
Application per organisation, made in fixed windows.
It is aimed at zero-emission HGVs, vans and coaches, and applications run in cyclical windows rather than all year
round. The DfI lists a window that opened on 25 March 2026 and closed on 30 June 2026 (projects completing by
31 March 2027), and a second window from 28 October 2026 to 29 January 2027 (delivery by 31 March 2028). Windows
and rates change between cycles, so confirm the current terms at source before planning around them:
DfI: EV chargepoint and infrastructure grants.